EPS@ISEP | The European Project Semester (EPS) at ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
log [2013/06/12 17:54] – [14th Meeting (2013-06-06)] team3log [2013/06/12 17:59] (current) – [10th Meeting (2013-05-09)] team3
Line 225: Line 225:
   * Finish steel structure and confer with Fernando Ferreira and send results to Mrs. Malheiro   * Finish steel structure and confer with Fernando Ferreira and send results to Mrs. Malheiro
   * ´average´ filter concerning the data storage    * ´average´ filter concerning the data storage 
-  * Speak to Mr. Alvim about the clasp mechanism and possible solution+  * Speak to Mr. Alvim about the clasp mechanismpossible solution and the transport to ALTO 
 ==== 11th Meeting (2013-05-16) ==== ==== 11th Meeting (2013-05-16) ====
 === Agenda: === === Agenda: ===
QR Code
QR Code log (generated for current page)