EPS@ISEP | The European Project Semester (EPS) at ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
log [2013/06/12 17:40] – [10th Meeting (2013-05-09)] team3log [2013/06/12 17:59] (current) – [10th Meeting (2013-05-09)] team3
Line 225: Line 225:
   * Finish steel structure and confer with Fernando Ferreira and send results to Mrs. Malheiro   * Finish steel structure and confer with Fernando Ferreira and send results to Mrs. Malheiro
   * ´average´ filter concerning the data storage    * ´average´ filter concerning the data storage 
 +  * Speak to Mr. Alvim about the clasp mechanism, possible solution and the transport to ALTO
 +
 ==== 11th Meeting (2013-05-16) ==== ==== 11th Meeting (2013-05-16) ====
 === Agenda: === === Agenda: ===
Line 251: Line 253:
    
 === Minute: === === Minute: ===
 +  * use voltage regulators.  
 +      * less losses of energy  
 +      * proposed: 6V battery + regulators 
 +  * check the current of the components that we are going to use 
 +  * ask at LSA for power supply 
 +  * get an LED lamp (most energy efficient) 
 +\\ 
 + Further:  
 +  * think about a "rubberskirt" 
 ==== 13th Meeting (2013-05-30) ==== ==== 13th Meeting (2013-05-30) ====
 === Agenda: === === Agenda: ===
Line 280: Line 290:
 === Minute: === === Minute: ===
  
-   +   try to close the hull by using the rubber tape 
 +   * finish all parts as appropriate as possible
 ===== Activities ===== ===== Activities =====
 //Please register here all project activities// //Please register here all project activities//
QR Code
QR Code log (generated for current page)