log [2013/06/09 01:11] – [Activities] team3log [2013/06/12 17:59] (current) – [10th Meeting (2013-05-09)] team3
Line 1: Line 1:
 ======Logbook====== ======Logbook======
-//This is your logbook. Insert here all relevant information regarding the evolution of your project//+
 ===== Weekly Report ===== ===== Weekly Report =====
 ==== 1st Week Report (2013-02-20) - (2013-02-27) ==== ==== 1st Week Report (2013-02-20) - (2013-02-27) ====
Line 45: Line 45:
 During a test concerning the water-resistance of the hull it turned out that the clasp is not waterproof. During a test concerning the water-resistance of the hull it turned out that the clasp is not waterproof.
 We also have worked on poster, paper, final report, user manual, video, presentation. We also have worked on poster, paper, final report, user manual, video, presentation.
 +==== 16th Week Report (2013-06-05) - (2013-06-12) ====
 +
 +During the last week everybody was confronted with finishing the project. We met every day at LSA in order to finish our final report, poster, paper, video, last but not least, the final presentation.
 ===== Meetings ===== ===== Meetings =====
 ==== 1st Meeting  (2013-02-28) ==== ==== 1st Meeting  (2013-02-28) ====
Line 163: Line 166:
  
 === Minute: === === Minute: ===
 +  * make sure that the presentation won´t take longer than 15 minutes
  
 +\\
 +  * find out what the operating systems of the controllers provide\\
 +  * check the boards
 +  * design a flow chart
 ==== 7th Meeting (2013-04-18) ==== ==== 7th Meeting (2013-04-18) ====
 Interim Presentation Interim Presentation
Line 215: Line 223:
    
 === Minute: === === Minute: ===
 +  * Finish steel structure and confer with Fernando Ferreira and send results to Mrs. Malheiro
 +  * ´average´ filter concerning the data storage 
 +  * Speak to Mr. Alvim about the clasp mechanism, possible solution and the transport to ALTO
  
 ==== 11th Meeting (2013-05-16) ==== ==== 11th Meeting (2013-05-16) ====
Line 242: Line 253:
    
 === Minute: === === Minute: ===
 +  * use voltage regulators.  
 +      * less losses of energy  
 +      * proposed: 6V battery + regulators 
 +  * check the current of the components that we are going to use 
 +  * ask at LSA for power supply 
 +  * get an LED lamp (most energy efficient) 
 +\\ 
 + Further:  
 +  * think about a "rubberskirt" 
 ==== 13th Meeting (2013-05-30) ==== ==== 13th Meeting (2013-05-30) ====
 === Agenda: === === Agenda: ===
Line 271: Line 290:
 === Minute: === === Minute: ===
  
-   +   try to close the hull by using the rubber tape 
 +   * finish all parts as appropriate as possible
 ===== Activities ===== ===== Activities =====
 //Please register here all project activities// //Please register here all project activities//