log [2013/06/02 14:17] – [Activities] team3log [2013/06/12 17:59] (current) – [10th Meeting (2013-05-09)] team3
Line 1: Line 1:
 ======Logbook====== ======Logbook======
-//This is your logbook. Insert here all relevant information regarding the evolution of your project//+
 ===== Weekly Report ===== ===== Weekly Report =====
 ==== 1st Week Report (2013-02-20) - (2013-02-27) ==== ==== 1st Week Report (2013-02-20) - (2013-02-27) ====
Line 41: Line 41:
 In the mean time the final schematics were made. In the mean time the final schematics were made.
 ==== 15th Week Report (2013-05-29) - (2013-06-05) ==== ==== 15th Week Report (2013-05-29) - (2013-06-05) ====
-Poster, paper, finishing the final report, user manual, video, presentation+At Dismotor-Comércio de Motores e Acessórios Lda. in Matosinhos all necessary parts regarding the mooring mechanism and lamps have been chosen. A pro-forma lists all parts. 
 +Also the steel structure has been confirmed and was handed in at the responsible workshop. 
 +During a test concerning the water-resistance of the hull it turned out that the clasp is not waterproof. 
 +We also have worked on poster, paper, final report, user manual, video, presentation
 +==== 16th Week Report (2013-06-05) - (2013-06-12) ==== 
 + 
 +During the last week everybody was confronted with finishing the project. We met every day at LSA in order to finish our final report, poster, paper, video, last but not least, the final presentation.
 ===== Meetings ===== ===== Meetings =====
 ==== 1st Meeting  (2013-02-28) ==== ==== 1st Meeting  (2013-02-28) ====
Line 160: Line 166:
  
 === Minute: === === Minute: ===
 +  * make sure that the presentation won´t take longer than 15 minutes
  
 +\\
 +  * find out what the operating systems of the controllers provide\\
 +  * check the boards
 +  * design a flow chart
 ==== 7th Meeting (2013-04-18) ==== ==== 7th Meeting (2013-04-18) ====
 Interim Presentation Interim Presentation
Line 212: Line 223:
    
 === Minute: === === Minute: ===
 +  * Finish steel structure and confer with Fernando Ferreira and send results to Mrs. Malheiro
 +  * ´average´ filter concerning the data storage 
 +  * Speak to Mr. Alvim about the clasp mechanism, possible solution and the transport to ALTO
  
 ==== 11th Meeting (2013-05-16) ==== ==== 11th Meeting (2013-05-16) ====
Line 239: Line 253:
    
 === Minute: === === Minute: ===
 +  * use voltage regulators.  
 +      * less losses of energy  
 +      * proposed: 6V battery + regulators 
 +  * check the current of the components that we are going to use 
 +  * ask at LSA for power supply 
 +  * get an LED lamp (most energy efficient) 
 +\\ 
 + Further:  
 +  * think about a "rubberskirt" 
 ==== 13th Meeting (2013-05-30) ==== ==== 13th Meeting (2013-05-30) ====
 === Agenda: === === Agenda: ===
Line 257: Line 279:
    * In order to write the ´user manual´ we should include instructions for switching on/off the system. We also need to describe interface schematic and operation mode.     * In order to write the ´user manual´ we should include instructions for switching on/off the system. We also need to describe interface schematic and operation mode. 
    * Further we discussed boxes to place all electronics in. It needs to be watertight. Proposals are tupperware or a self-made plexiglass box. Mrs. Malheiro will check what kind of material is available at ISEP. After creating a draft, we need to speak to Mr. João Francisco da Silva (JFS) to confirm our ideas and build the box.    * Further we discussed boxes to place all electronics in. It needs to be watertight. Proposals are tupperware or a self-made plexiglass box. Mrs. Malheiro will check what kind of material is available at ISEP. After creating a draft, we need to speak to Mr. João Francisco da Silva (JFS) to confirm our ideas and build the box.
 +
 +==== 14th Meeting (2013-06-06) ====
 +=== Agenda: ===
 +   * User manual
 +   * Electronics
 +   * Programming
 +   * Non-waterproof hull
 +   
 +
 +=== Minute: ===
 +
 +   * try to close the hull by using the rubber tape
 +   * finish all parts as appropriate as possible
 ===== Activities ===== ===== Activities =====
 //Please register here all project activities// //Please register here all project activities//
Line 295: Line 330:
 | 2013-04-25 | 2013-05-03 | LSA | Testing functionality of the buoy hull; Meetings about steel structure and electronic schematic | All | | 2013-04-25 | 2013-05-03 | LSA | Testing functionality of the buoy hull; Meetings about steel structure and electronic schematic | All |
 | 2013-05-07 | 2013-05-16 | Improving/Testing/Meetings | Further proceeding on the steel structure/electronic schematic/buoy hull. Different meetings concerning the three main issues took place. New materials and components needs to be provided. E.g. rubbertabe, bolts, nuts etc.| All | | 2013-05-07 | 2013-05-16 | Improving/Testing/Meetings | Further proceeding on the steel structure/electronic schematic/buoy hull. Different meetings concerning the three main issues took place. New materials and components needs to be provided. E.g. rubbertabe, bolts, nuts etc.| All |
-| 2013-05-21 | 2013-05-21 | Toon wrote the final version of the sustainability part | / | Toon |+| 2013-05-21 | 2013-05-21 | Editing the sustainability part | / | Toon |
 | 2013-05-24 | 2013-05-24 | Meeting with Mr. Alvim at LSA | Mr. Alvim took the buoy hull back to ALTO for repairing broken parts. Afterwards we had a Teammeeting and discussed further proceeding and essential steps for the next phase, the last phase.| All | | 2013-05-24 | 2013-05-24 | Meeting with Mr. Alvim at LSA | Mr. Alvim took the buoy hull back to ALTO for repairing broken parts. Afterwards we had a Teammeeting and discussed further proceeding and essential steps for the next phase, the last phase.| All |
 | 2013-05-25 | 2013-05-25 | Shopping | Bennet went to Multiborracha, Acessórios de Borracha e Plásticos, Lda. in Alfena to get the EPDM rubber tape (6,10 EUR) | Bennet | | 2013-05-25 | 2013-05-25 | Shopping | Bennet went to Multiborracha, Acessórios de Borracha e Plásticos, Lda. in Alfena to get the EPDM rubber tape (6,10 EUR) | Bennet |
Line 303: Line 338:
 | 2013-05-31 | 2013-05-31 | Making the hull waterproof | We fixed a new rubber to make the hull watertight| Bennet, Toon | | 2013-05-31 | 2013-05-31 | Making the hull waterproof | We fixed a new rubber to make the hull watertight| Bennet, Toon |
 | 2013-05-31 | 2013-05-31 | Microcontroller | We started to work with the microcontrollor and did research about programming| Konrad, Toon | | 2013-05-31 | 2013-05-31 | Microcontroller | We started to work with the microcontrollor and did research about programming| Konrad, Toon |
 +| 2013-06-01 | 2013-06-06 | daily Meetings | at LSA, working on the report, the steel structure, electronics and the clasp of the hull | All |
 +| 2013-06-05 | 2013-06-05 | Tests | water-resistance of the hull | All |
 +| 2013-06-06 | 2013-06-12 | Finalising |Report, Video, Paper, Poster, Electronics, Tests at LSA| All |
 | 2013-xx-xx | 2013-xx-xx | Template | x.x.x.x.x.x.x.x.x.x.x.x.x. | All | | 2013-xx-xx | 2013-xx-xx | Template | x.x.x.x.x.x.x.x.x.x.x.x.x. | All |